Skip to content
(347) 262-9435

Free · No sign-up

Field guidesfor the work

The things people actually search for at eleven at night, answered properly: which colour goes on which pin, what a bridging clip does, how much twist you are allowed to lose, and what a finished switch configuration should contain. Interactive where a diagram beats a paragraph.

Guides
37
Glossary terms
45
Cost, forever
$0
Sign-ups
0

Showing all 37

Cabling & low-voltage

Copper, glass,
pin by pin

Termination and specification work, with the colour codes rendered rather than described. Every diagram is interactive because the question is always 'which one goes here', and a picture you can flip answers it faster than a table you have to read twice.

10

Testing & verification

Proving it
actually works

The half of the job that decides whether the rest of it holds. Finding a cable in a bundle of two hundred, reading the report that says the run passed, and choosing the instrument that produces it.

3

Networking & wireless

The network,
layer by layer

Switching, addressing, and the radio side. What a configuration should contain when you hand it over, where the addressing behind it comes from, and how to read the network when something on it is broken.

9

Voice & telecom

Tip, ring,
and what replaced it

Analogue lines and the SIP services taking over from them. The largest single share of the work we do, and the part with the most undocumented wiring and the most things that quietly stop working when somebody cuts over.

2

Racks & rooms

What the room
looks like after

The part that decides whether the next person can work on it: how a rack is filled, and how every port is labelled so the label still means something in three years.

5

Field operations

Running the job,
not just the work

Sequencing, access, and handover. The parts that decide whether a floor opens on Monday, written from projects where it had to.

3

How these are written

Every one of these is something we have had to explain on site, usually to somebody competent who had simply never been shown.

There is a lot of wiring information on the internet and a great deal of it is wrong, contradictory, or a nine-minute video of somebody’s hands. So these say the thing plainly, show the colours rather than naming them, and are specific about where the standard ends and field practice begins — because those are not the same, and pretending otherwise is how people end up defending a decision they cannot source.

House rules

  1. No account, no email gate, no video.

  2. Nothing you enter is stored or transmitted.

  3. Colour is never the only way information is carried — every swatch is named in text.

  4. Where a standard specifies a number, it is cited as a standard. Where it is field practice, it says so.

  5. Guides, not engineering sign-off. On a job with a certification requirement, certify it.

Book the work

We pull the cable as well as explain it

If you are reading a termination guide because a building full of it needs doing, that is the work we do. Estimates are free and the conversation costs nothing.

Or call and speak to someone who does the work(347) 262-9435inquiries@jcitsystems.com
  • Free guides
  • No sign-up
  • Nothing tracked
  • Written on the job